Teston Road Environmental Assessment Project Updates
Study Process
The Teston Road Environmental Assessment (EA) study will assess alternative improvements with consideration of impacts to transportation service and the natural, socio-economic and cultural environments. The study will be completed in accordance with the planning and design process for Schedule ‘B’ projects, as outlined in the Municipal Engineers Association Municipal Class EA guidelines (October 2000, as amended in 2007, 2011 and 2015).
- Notice of Study Completion (PDF)
- Project File Report (PDF)
- Appendix A - Public Consultation (PDF)
- Appendix B - Agency Consultation (PDF)
- Appendix C - Indigenous Consultation (PDF)
- Appendix D – Transportation and Traffic Analysis Report (PDF)
- Appendix E – Stage 1 Archaeological Assessment Report (PDF)
- Appendix F – Cultural Heritage Resource Assessment Report (PDF)
- Appendix G – Natural Environmental Report (PDF)
- Appendix H – Arborist Report (PDF)
- Appendix I – Geotechnical Investigation Report (PDF)
- Appendix J – Fluvial Geomorphology Report (PDF)
- Appendix K – Drainage and Stormwater Management Report (PDF)
- Appendix L – Contamination Overview Study Report (PDF)
- Appendix M – Preliminary Design (PDF)
- Appendix N – Noise Impact Assessment (PDF)
- Appendix O – Air Quality Impact Assessment (PDF)
- Appendix P – Utility Composite and Conflict Plan (PDF)
- Appendix Q – Hydrogeology Report (PDF)
- Appendix R – Preliminary Cost Estimate (PDF)
- Notice of online public information centre (PDF)
- Study Notice of Commencement (PDF)
Study Phases
Phase 1: Identify the problem or opportunity
Phase 2: Identify, assess and evaluate alternative solutions to address the problem or opportunity and establish a preferred solution.
Upon study completion, a Project File Report (PFR) will be made available for public review and comment. The PFR will document the study and consultation process, and decision-making rationale.