Contractor and New Developments
Below are all the forms and applications required for contractors and new developments when managing water and wastewater.
To apply for a hydrant meter rental, new water meter application and/or a temporary water meter connection, please visit Service Vaughan.
After applying
After applying for a hydrant meter rental, new water meter application and/or a temporary water meter connection, please follow these steps:
- Hydrant Meter Rental Request (PDF)
- New Water Meter Application (PDF)
- Temporary Water Meter Connection Request (PDF)
By-Laws
- Backflow Prevention By-Law (177-2020) (PDF)
- Fees and Charges By-law (131-2022) (PDF)
- Water By-Law (106-2022) (PDF)
- Water Rates (PDF)
New watermains
- New Watermain Commissioning Requirements (PDF)
- Drinking Water Works Permit (PDF)
- Municipal Drinking Water Licence (PDF)
Backflow prevention
- Hydrant and New Watermain Backflow Preventer Test & Inspection Report (PDF)
- Residential Irrigation Installation Request (PDF)
Disinfection
- Watermain Disinfection Checklist for Contractors and Subcontractors (PDF)
- Proponent Request Form (For Connection more than six metres up to 40 metres) (PDF)
- Contractor/Subcontractor Site Summary (PDF)
- Watermain Disinfection Plan – Disinfection Site Map/Swabbing Plan/Sketch (PDF)
- Watermain Disinfection Plan – Disinfection Criteria (PDF)
- Disinfection Records (PDF)
- Dechlorination/Discharge Log (PDF)
Water quality flushing program
- New Development Watermain Flushing Program – Third-party Chlorine Residuals/Consumption (PDF)
- Flushing Program – Request for Reduction or Cessation (PDF)
- Flushing Program – Consumption Calculation (PDF)