Integrated Urban Water Plan Project Updates

Integrated Urban Water Plan Notice of Commencement June 2020 (PDF)
Integrated Urban Water Plan Public Information Centre (PIC) 1 January 2021 (PDF)
Integrated Urban Water Plan Public Information Centre (PIC) 2 July 2022 (PDF)

Integrated Urban Water Plan Public Information Centre (PIC) 3 Monday, Feb. 5, 2024 (PDF)

 

A Class Environmental Assessment Report (EA) was prepared to document the study process, consultation efforts, and the recommended plan. The Notice of Completion placed the report on the public record for review for 30 days, from June 15, 2024, to July 15, 2024. The Environmental Study Report (ESR) is available can be downloaded on the Project Updates page. Comments can be submitted through this feedback form.

 

Integrated Urban Water Plan Class EA Report June 2024 (PDF)

Appendix 1- Study Area Characterization (PDF)

Appendix 2- Water and Wastewater Design Criteria and Service Levels (PDF)

Appendix 3- York Region Water and Wastewater Master Plan Capital Projects (PDF)

Appendix 4- Advanced LID in Vaughan Research Paper (PDF)

Appendix 5- Population Forecast (PDF)

Appendix 6.1- Consolidated FSSR Concord GO Final Jun 2024 (PDF)

Appendix 6.2- Consolidated FSSR Maple GO Final Jun 2024 (PDF)

Appendix 6.3- Consolidated FSSR Promenade Centre Final Jun 2024 (PDF)

Appendix 6.4- Consolidated FSSR Steeles West Final Jun 2024 (PDF)

Appendix 6.5- Consolidated FSSR VMC Final Jun 2024 (PDF)

Appendix 6.6- Consolidated FSSR Weston and 7 Final Jun 2024 (PDF)

Appendix 6.7- Consolidated FSSR Carville Centre Final Jun 2024 (PDF)

Appendix 6.8- Consolidated FSSR Rutherford GO Final Jun 2024 (PDF)

Appendix 6.9- Consolidated FSSR Vaughan Mills Final Jun 2024 (PDF)

Appendix 6.10- Consolidated FSSR Woodbridge Centre Final Jun 2024 (PDF)

Appendix 6.11- Consolidated FSSR Yonge and Steeles Final Jun 2024 (PDF)

Appendix 7- Public Consultation (PDF)