Integrated Urban Water Plan Project Updates
Integrated Urban Water Plan Notice of Commencement June 2020 (PDF)
Integrated Urban Water Plan Public Information Centre (PIC) 1 January 2021 (PDF)
Integrated Urban Water Plan Public Information Centre (PIC) 2 July 2022 (PDF)
Integrated Urban Water Plan Public Information Centre (PIC) 3 Monday, Feb. 5, 2024 (PDF)
A Class Environmental Assessment Report (EA) was prepared to document the study process, consultation efforts, and the recommended plan. The Notice of Completion placed the report on the public record for review for 30 days, from June 15, 2024, to July 15, 2024. The Environmental Study Report (ESR) is available can be downloaded on the Project Updates page.
Integrated Urban Water Plan Class EA Report Final (PDF)
Appendix 1- Study Area Characterization (PDF)
Appendix 2- Water and Wastewater Design Criteria and Service Levels (PDF)
Appendix 3- York Region Water and Wastewater Master Plan Capital Projects (PDF)
Appendix 4- Advanced LID in Vaughan Research Paper (PDF)
Appendix 5- Population Forecast (PDF)
Appendix 6.1- Consolidated FSSR Concord GO Final (PDF)
Appendix 6.2- Consolidated FSSR Maple GO Final (PDF)
Appendix 6.3- Consolidated FSSR Promenade Centre Final (PDF)
Appendix 6.4- Consolidated FSSR Steeles West Final (PDF)
Appendix 6.5- Consolidated FSSR VMC Final (PDF)
Appendix 6.6- Consolidated FSSR Weston and 7 Final (PDF)
Appendix 6.7- Consolidated FSSR Carville Centre Final (PDF)
Appendix 6.8- Consolidated FSSR Rutherford GO Final (PDF)
Appendix 6.9- Consolidated FSSR Vaughan Mills Final (PDF)
Appendix 6.10- Consolidated FSSR Woodbridge Centre Final (PDF)
Appendix 6.11- Consolidated FSSR Yonge and Steeles Final (PDF)
Appendix 7- Public Consultation (PDF)