Pine Valley Drive

Project updates

 

Phase 1

Virtual information sessions – COMPLETED (Jan. 2023)

If you were unable to attend the session on Jan. 25, 2023, you can watch a recording or review the presentation slides (PDF). 

 

Survey – COMPLETED (Jan. 23 to Feb. 15, 2023)

Residents were invited to take an online survey to provide their feedback to help identify any additional road safety opportunities.

 

Phase 2

Virtual information sessions – COMPLETED (May 2023)

If you were unable to attend the session on April 19, 2023, you can review the presentation slides (PDF). 

 

Read the engagement summary (PDF).

 

Phase 3

Feedback on proposed improvements – COMPLETED (May 2024)

Following public consultations in Phase 1 and Phase 2, a set of proposed traffic improvements have been developed for Pine Valley Drive. As part of Phase 3, residents were invited to review a detailed map (PDF) outlining the proposed traffic improvements and provide feedback by emailing the project team.

Map of study area

 

Image
Pine Valley Dr