Vaughan Complete Streets Guidelines Project Updates
The Vaughan Complete Streets Design Guidelines take place in the following phases:
Phase 1 – Existing Conditions (August to November 2021) COMPLETE
- Developed a work plan
- Created a report template
- Reviewed existing conditions
- Performed a background review
- Performed a review of policies, requirements and criteria for the guidelines
Phase 2 – Communication and Engagement
- Developed a communication and consultation strategy development (October to November 2021) COMPLETE
- Online Mapping Exercise - Survey Feedback (June-July 2022)
Phase 3 – Street Design and Classification (October 2021 to February 2023) COMPLETE
- Review draft Vaughan Transportation Plan
- Develop cross-section
- Refine Vaughan Transportation Plan classes for street context
Phase 4 – Draft Guidelines (December 2022 – August 2023)
- Develop draft Complete Streets Guidelines
- Define background and existing conditions
Phase 5 – Prioritization and Implementation (June to August 2023)
- Create implementation actions
- Develop phasing plan
- Prioritize street retrofit list
- Develop funding and cost estimates
Phase 6 – Final Guidelines (August – December 2023)
- Present final Complete Street Guidelines
- Open House presentation (PDF)
- Draft appendices (PDF)
- Draft guidelines (PDF)