About the Bass Pro Mills Drive Extension
Bass Pro Mills Drive is being extended, from Highway 400 to Weston Road.
Project area
About the Municipal Class Environmental Assessment Study
The City of Vaughan has undertaken the Municipal Class Environmental Assessment study to further assess the need to extend Bass Pro Mills Drive, from Highway 400 to Weston Road, as recommended in the Vaughan Mills Centre Secondary Plan (2014).
These recommendations were made to:
- provide a new east-west multi-modal connection between Highway 400 and Weston Road;
- help alleviate traffic congestion on the adjacent road network;
- support future growth and development within the plan area;
- create new multi-modal transportation connections; and,
- develop a safe and comfortable environment for active transportation users.
Based on the findings of this study, the Preferred Design consists of the relatively straight extension of Bass Pro Mills Drive, from Highway 400 to Weston Road, and a new, 30 metre road right-of-way that accommodates, four lanes of vehicular traffic (two lanes in each direction), a separated sidewalk and cycling path and boulevard on both sides of the roadway, including intermittent drainage retention, streetlighting and streetscaping features. The existing Highway 400 bridge will also be modified.
An Environmental Study Report (PDF) was prepared to document the study process, consultation efforts and recommended plan. The Notice of Completion placed the Environmental Study Report on public record for review for 30 days between Aug. 18, 2022 to Sept. 19, 2022. No Section 16 order was received.
Following the 30-day review period, in co-ordination with the Ministry of Transportation Ontario, modifications were made to the recommended plan for the Highway 400 bridge crossing only.