A176/24
Relief from the Zoning By-law is being requested to permit the construction of a Battery Energy Storage System (‘BESS’) that is used to provide power to the energy grid in the case of a blackout or dip in power on the hydro grid. Relief is also required to facilitate related Site Plan Application DA.24.042.