A223/18
Relief from the by-law is being requested to permit the continued construction of a cabana (located in the rear yard) and to permit the construction of a proposed covered patio (located in rear yard).
Relief from the by-law is being requested to permit the continued construction of a cabana (located in the rear yard) and to permit the construction of a proposed covered patio (located in rear yard).
Relief from the by-law is being requested to permit the construction of a proposed employment warehouse facility.
Relief from the by-law is being requested to permit the construction of a proposed detached garage located in the rear yard.
Relief from the By-Law is being requested to permit the construction of a proposed detached three (3) car garage.
Relief from the By-Law is being requested to permit the construction of a proposed detached three (3) car garage.
Relief from the by-law is requested to permit existing soft landscaping in the rear yard and existing accessory structure (pergola) located in the southerly side yard and rear yard.
Consent is being requested for an easement over Part 1 on Plan 65R-22497 for an access purposes (vehicular) in favour of the lands to the south municipally known as 9560 Islington Avenue (dominant land).
Relief from the by-law is being requested to permit interior renovations to an existing building (described as Building A) to accommodate additional office space.
Relief of the by-law is being requested to permit the construction of a proposed dwelling and lanai.
Relief from the By-Law is being requested to permit the construction of a proposed single family dwelling. The existing dwelling is to be demolished.