A159/19

Relief from the By-law is being requested to permit the construction of three (3) proposed additions to the existing church and to permit the reconfiguration of the existing driveway fronting onto Bainbridge
Avenue to facilitate Site Plan Application DA.19.045.
 

Three additions are comprised of a new storage room, expansion of rear entrance with washroom facilities and expansion to narthex and new bell tower.

A158/19

Relief from the bylaw is being requested to permit the construction of a proposed inground swimming pool to be located at the rear of the existing dwelling and a pool equipment pad to be located in the interior side yard (north).

A152/19

Relief from the by-law is being requested to permit reduced lot frontage on the retained land to facilitate Consent Application B034/19.

A149/19

Relief from the by-law is being requested to permit the construction of a proposed accessory structure (cabana) to be located in the rear yard.

A148/19

Relief from the by-law is being requested to permit the construction of a proposed deck to be located at the rear of the proposed dwelling.

A143/19

Relief from the By-law is being requested to permit the construction of a proposed 1 storey addition to the existing single family dwelling and covered patio (including exterior fireplace, barbeque counter and 2
columns) to be located at the rear of the existing dwelling. Relief is also being sought to permit the existing shed located in the rear year and to permit an expansion of the existing driveway.

A141/19

Relief from the by-law is being requested to permit the construction of a proposed second storey addition over the existing garage and a proposed two-storey addition to the front of the existing dwelling.
 

Relief is also being requested to permit the existing dwelling, deck and driveway.

A136/19

Relief from the by-law is being requested to permit the existing deck located in the rear yard and to permit the construction of a proposed cover (roof) over a portion of the existing deck.

Subscribe to