Help our winter operations run smoothly

Keep catch basins clear, don’t park on the road and place waste properly


We’re clearing the way! As another round of snowfall hits Vaughan, the City of Vaughan’s Public Works crews continue to work around the clock to clear snow and ice from roads and sidewalks throughout the community. We’re doing our part – but did you know you also have a very important role to play?

 

B016/24

Consent is being requested to permit a lease greater than 21 years over Part 1 (as shown on the Plan submitted with the application) in favour of Vaughan 3 Energy Storage 1 GP Inc. (as general partner for and on behalf of Vaughan 3 Energy Storage 1 LP).  

The leased lands will be used to operate a Battery Energy Storage System (‘BESS’). The BESS is being implemented to provide power to the energy grid in the case of a blackout or dip in power on the grid. The retained land consists of Parts 2, 3, 4, 6 & 8 on the submitted plans.  

A207/24

Relief from the Zoning By-law is being requested to permit a proposed swimming pool in the rear yard and installation of related pool equipment. 

A204/24

Relief from the Zoning By-law is being requested to permit a proposed Place of Worship (St. Andre Bessette Parish Roman Catholic Church), which includes a single detached dwelling to be attached to the Church. Relief is also required to facilitate related Site Plan Application DA.18.099.

A198/24

Relief from the Zoning By-law is being requested to permit a secondstorey addition to the existing dwelling and an addition to the existing garage. 

A197/24

Relief from the Zoning By-law is being requested to permit increased driveway width and reduced parking requirements for the principal dwelling and secondary suite.  

A196/24

Relief from the Zoning By-law is being requested to permit a proposed addition to the existing dwelling which includes a one storey addition to the side (new garage); a one storey addition to the rear; and a new roof with loft space.

Subscribe to